STATE OF TEXAS              §

 

COUNTY OF BEXAR          §                                                                                              ORDINANCE #620

 

CITY OF CONVERSE          §

 

AN ORDINANCE REGULATING AND RESTRICTING THE CONSTRUCTION OF BUILDINGS AND OTHER STRUCTURES; ADOPTING THE LATEST EDITIONS OF THE INTERNATIONAL CODES AS PUBLISHED BY THE INTERNATIONAL CODE COUNCIL AND THE  NATIONAL FIRE PROTECTION ASSOCIATION;  REQUIRING A SURETY BOND FOR PERSONS CONTRACTED TO PERFORM HOME IMPROVEMENTS, SIGN INSTALLATION, FENCE INSTALLATION AND ELECTRICAL BUSINESS; ESTABLISHING APPROPRIATE FEES FOR THE REQUIRED PERMITS AND INSPECTIONS; AND SUPERSEDING OTHER ORDINANCES IN CONFLICT.

 

Whereas, it is the desire of the City Council to protect the health, safety, and general welfare of the citizens of Converse; and,

 

Whereas, quality control and assurance of building construction is imperative to protect the health, safety, and general welfare of the citizens of Converse; and,

 

Whereas, the latest editions of the international codes as published by the International Code Council and the  National Fire Protection Association provide a means of providing quality control and assurance of building construction; and,

 

Whereas, the costs and fees associated with implementing the building codes and performing the necessary inspections should be paid by the users of the services rather than the taxpayers;

 

NOW, THEREFORE, BE IT ORDAINED by the City Council of the City of Converse, Texas:

 

 

SECTION I.  BUILDING INSPECTIONS DEPARTMENT:

 

A.     The Building Department shall be administered by the Building Official under the direction of the City Manager.  The Building Department shall process applications for construction, review plans, assess appropriate fees, and conduct the following types of inspections.

 

1. Code Compliance inspections

2. Building inspections

3. Heating/Air Conditioning and Refrigeration

4. Plumbing inspections

5. Electrical inspections

6. Sidewalk/flatwork inspections

7. Manufactured/Mobile home inspections

 

B.       The Building Department shall, in addition to all other duties and functions imposed by ordinances, furnish administrative assistance to the Planning Commission, Zoning Commission and the Building and Standards Commission in the performance of their duties.

 

SECTION II.  BUILDING CODE:

A.      The following International Codes, including the current editions and all updated and amended editions are hereby adopted by reference as though they were copied herein fully:

 

1. International Building Code

2. International Plumbing Code

3. International Mechanical Code

4. International Residential Code

5. International Fuel Gas Code

6. International Property Maintenance

7. National Electric Code - Published by National Fire Protection Association, Inc.

 

B.    All construction within the city limits of Converse shall comply with the latest editions as published by the International Code Council.  It shall be unlawful for any person to erect, construct, enlarge, alter, repair, move, improve, remove, convert, equip, use, occupy or maintain any building or structure in the city or cause the same to be done, contrary to or in violation of any of the provisions of the codes adopted herein and this Ordinance.

 

 

SECTION III.  LICENSES: In addition to filing an application for and receiving a permit from the Building Department for each Project undertaken, any person contracted in home improvement, heating/air conditioning, plumbing and electrical business shall have a license from the City of Converse, a Texas Municipality, or from the State authorizing them to perform such work.

 

 

SECTION IV.  SURETY BONDS: 

 

A.      In addition to filing the permit application discussed above, any person contracted in the home improvement and electrical business shall file a surety bond.  A properly executed Surety bond, issued and validated by a company duly authorized to do business in the State of Texas, in the amount of five thousand dollars ($5,000.00). shall be placed on file at the Building Department office.

 

B.       This bond shall assure the faithful performance of all work contracted in strict compliance with the terms, requirements and provisions of the applicable codes adopted by this Ordinance.  Further, the bond shall assure that the contractor shall, without additional cost to the person, firm or corporation for which such contract work is done, correct any defect due to the faulty workmanship, materials, or noncompliance with the provisions of the applicable code.  Such corrections shall be accomplished within seventy-two (72) hours after receipt of notification by the building official.

 

C.       The company issuing the surety bond shall include a provision in the surety bond for notification of surety cancellation or reduction in the amount of surety.  Such notification shall be given in writing to the Building Department and shall become effective at 12:00 p.m. after five (5) consecutive working days of receipt by the Building Department of such notification of cancellation or reduction in the amount of the surety bond.  No permit shall be issued to the principal (contractor) until such time as the surety bond has been revalidated to the amount stated above.

 

D.      All surety bonds shall terminate one year from date of issue.

 

 

SECTION V.  SCHEDULE OF PERMIT FEES:

 

A.      Building Permit Fees:  Building permit fees are based on the value of construction as follows:

 

                  Total Valuation                                                                   Fee

 

$1,000.00 and less                                                              $20.00

 

$1,001.00 to $50,000.00                                                      $20.00 for the first $1,001.00 plus $5.00 for each additional thousand or fraction thereof, to and including

 

$50,001.00 to $100,000.00                                                  $265.00 for the first $50,001.00 plus $4.00 for additional thousand or fraction thereof, to and including $100,000.00

 

                  $100,001.00 to 500,000.00                                                  $465.00 for the first $100,001.00 plus $3.00 for each additional thousand or fraction thereof, to and including $500,000.00.

 

$500,001.00 and up.                                                            $1,665.00 for the first $500,001 plus $2.00 for each additional thousand or fraction thereof.

 

B.    Re-Roof.                                                                              $25.00

 

C.    Curb Cuts.                                                                           $35.00

 

D.    Certificate Of Occupancy.                                                $50.00 (non-refundable)

 

E.     Variance Request.                                                              Based on valuation of construction

                                                                                                      maximum fee $100.00

 

F.     Moving Fee.                                                                       For the moving of any building or structure,

                                                                                            the fee $100.00.

 

G.    Demolition.                                                                          For the demolition of any building or

structure, the fee shall be $50.00 up to 1,000 square feet and $.50 per 1,000 square feet over.

 

H.    Plan Checking Fee.                                                            When the value of the proposed

construction exceeds $1,000.00 and a plan is required to be submitted, a plan-checking fee shall be paid to the building official. Said plan checking fee shall be equal to one-half of the building permit fee. Such plan-checking fee is in addition to the building permit fee.

 

I.      Non Compliance Fees.                                                      Where work for which a permit is required

is started or proceeded prior to obtaining said permit, the fees herein specified shall be doubled, but the payment of such double fee shall not relieve any persons from fully complying with the requirements of the code in the execution of the work nor from any other penalties prescribed herein.

 

A fee of $100.00 shall be assessed for proceeding with any work without having an approved inspection at the required stage of construction.

 

A re-inspection fee of $50.00 shall be assessed for each failed inspection. A fee of $100.00 shall be assessed for failure to correct any code violations as directed by the inspector.

 

 

J.     Licensing/Registration Fees:

         

                  General or New Home Contractor.                                   $75.00 initial fee and $50.00 renewal fee.

         

                  Master Electrical.                                                               $75.00 initial fee and $50.00 renewal fee.

         

                  State Licensed Plumbers.                                                  $15.00 registration fee.

                  State Licensed Hvac.                                                         $15.00 registration fee.

 

                  State Licensed Irrigators.                                                  $15.00 registration fee.

         

Sign Contractor.                                                                 $50.00 initial fee and $25.00 renewal fee.

 

Fence Contractor.                                                              $50.00 initial fee and $25.00 renewal fee.

 

K.      Gas Permit Fees (Base Permit):                                         $30.00

In addition to the permit fee, the following fees shall be assessed:

 

1) The fees for inspection of consumers' gas piping at one location (including both rough and final piping inspection) shall be $5.00 for one to four outlets, inclusive, and $1.00 for each additional outlet;

 

2) The fees for inspection conversion burners, floor furnaces, incinerators, boilers, or central heating or air conditioning unit. shall be $5.00 for one unit and $1.00 for each additional unit;

 

3) The fee for inspection vented wall furnaces and water heaters shall be $2.50 for one unit and $1.00 for each additional unit.

 

 

L.     Fuel Tanks (Base Permit Fee)                           $30.00 plus:

 

0 to 1,000 gallons                                                               $25.00

 

over 1,000 gallons                                                              $35.00

 

Pump                                                                                    $15.00 (each)

 

 

M.   Plumbing Permit Fees (Base Permit Fee)        $30.00; Plus the following when provided:

 

For each plumbing fixture, floor drain                             $2.50

 or trap (including Water and Drainage

Piping)

 

                  For each House Sewer                                                      $ 5.00

 

For each House Sewer having to be                               $ 5.00

                  replaced or repaired.

         

For each Septic Tank and Seepage                 $10.00

                  Pit or Drain field.

 

For each Water Heater and/or Vent.                               $ 2.50

 

For installation, alteration or repair                                 $ 2.50

of water piping and/or water treating

equipment.

 

For repair or alteration of                                  $ 5.00

Drainage or Vent Piping.

 

For Vacuum Breakers or back flow                  $ 2.50 for one to five.

protective devices installed subsequent       $ 1.50 each for all over five.

to the installation of the piping or

equipment served;

 

                  Irrigation/Sprinkler System                                               $30.00 plus $1.00 per            head.

         

                  Fire Sprinkler System                                                         $35.00 plus $1.00 per            head.

 

N.      Hvac/Mechanical Permits (Base Fee)             $30.00

 

Fee for inspecting heating, ventilating, ductwork, air conditioning and refrigeration Systems shall be $10.00 for the first $1,000.00, or fraction thereof, of valuation of the installation plus $2.00 for each additional $1,000.00 or fraction thereof.

 

Fee for inspecting repairs, alterations and additions to an existing system shall be $5.00 plus $2.00 for each $1,000.00 or fraction thereof.

 

O.    Electrical Permit Fees (Base Fee)                                     $30.00 plus the following as appropriate:

 

1.     Private Swimming Pools.                                           $44.25 each Pool.

For new private, in-ground swimming pools for single-family and multifamily occupancies including a complete system of necessary branch circuit wiring, bonding, grounding, underwater lighting, water pumping and other similar electrical equipment directly related to the operation of a swimming pool.

 

2.     Temporary Power Service.                                        $30.00 each

For a temporary service pole or pedestal including all pole or pedestal-mounted receptacle outlets and appurtenances.

 

3.        Receptacle, Switch and Light                                   $25.00 each for the first 20 fixtures.

Outlets.                                                                        $0.65 each for additional fixtures.

For receptacle, switch, light or other outlets at which current is used or controlled, except services, feeders and meters:  (Note: For multi-outlet assemblies, each 5 feet or fraction thereof may be considered as one outlet).

 

4.     Signs Outline Lighting and Marquees.  $30.00 each

For signs, outline lighting systems or marquees supplied from one branch circuit.

For additional branch circuits within      $ 4.25 each

the same sign, outline. lighting system or marquee.

 

4.        Services.

 

For services of 600 volts or less and      $27.25 each

not over 200 amperes in rating.

 

For services of 600 volts or less and      $55.50 each

over 200 amperes to 1,000 amperes.

 

For services over 600 volts or over         $111.00 each.

1,000 amperes in rating.

 

5.        Miscellaneous Apparatus, Conduits and Conductors.

 

For electrical apparatus, conduits and   $16.25

conductors for which a permit is required but for which no fee is herein set forth.

 

O.      Expiration:  Every permit issued shall become invalid if work has not commenced 180 days after issuance.  Every permit expires 365 days after issuance.  The building official may grant an extension of no more than 180 days.  The renewal fee shall be fifty percent of the original permit fee.  Any person, firm or corporation may apply to the City Council for any further extensions.

 

P.       Fee Refunds:  The Building Official shall authorize the refunding of fees as follows

 

1.        No more than seventy-five percent of the permit fee paid when no work has been done under a permit issued.

 

2.        Written application must be filed with the City of Converse by the original permittee no later than ninety days from permit issuance.

 

 

SECTION VI. SEVERABILITY:  If any section, subsection, paragraph, sentence, clause, phrase, or word in this Ordinance, or application thereof to any person or circumstance is held invalid, such holding shall not affect the validity of the remaining portion despite such invalidity.

 

 

SECTION VII.  PENALTY:  Any  person, firm, or corporation violating any of the provisions of this code may be charged with a misdemeanor.  Each day or portion thereof during which any violation of any of the provisions of this Ordinance or the codes adopted herein is committed, continued or permitted shall justify a separate charge with a misdemeanor.  Upon conviction, a person, firm, or corporation violating any of the provisions of this Ordinance shall be liable for a fine not less than two hundred dollars ($200.00), not more than two thousand dollars ($2,000) for each separate offense.

 

 

SECTION VIII.  SUPERSCESSION:  This Ordinance supersedes City of Converse Ordinance #620 dated December 18, 2001.

 

 

PASSED AND APPROVED this 20th Day Of January 2004.

 

 

 

 

 

                                                                                                                            _____________________________

Craig Martin, Mayor

 

 

 

.

ATTEST:

 

 

 

____________________________

A. I. Hieronymus, City Secretary